Project Information
Project Description:
The South Carolina Department of Transportation (SCDOT) is proposing to replace 18 bridges in Berkeley, Colleton, Darlington, Dorchester, Florence, Georgetown, Horry, Marion, and Williamsburg counties. These bridges make up Package 22 and are part of the SCDOT’s Closed and Load Restricted Bridge (CLRB) Program.
Proposed Improvements:
Bridges will either be replaced on existing alignment with a signed detour that would reroute traffic during construction; or bridges will be replaced adjacent to the existing alignment allowing through-traffic during construction.
The package is being delivered through a design-build contract, allowing for innovation through design and schedule acceleration.
Purpose and Need:
The purpose of the project is to restore all components to good condition. The eighteen existing bridges have one or more components in poor condition.Bridges within Package 22:
Click below to view bridges by County
Below you will find information about each bridge within Package 22 organized by County. Information will include location, estimated schedule and detour route, if needed.
Berkeley County
S-791 (Old Hwy 52) over Molly Branch
S-791 (Old Hwy 52) over Canterhill Swamp
S-791 (Old Hwy 52) over Wapoola Creek
Estimated Schedule
-
Timeline item 1 - incomplete
Construction
Construction Start - TBD
Colleton County
S-41 (Ritter Rd) over Ashepoo River
Estimated Schedule
-
Timeline item 1 - incomplete
Construction
Construction Start - TBD
Darlington County
S-495 (Georgetown Rd) over Back Swamp
Estimated Schedule
-
Timeline item 1 - incomplete
Construction
Construction Start - TBD
Detour Route
Dorchester County
S-19 (Wire Rd) over Indian Fields Swamp
Estimated Schedule
-
Timeline item 1 - incomplete
Construction
Construction Start - TBD
Florence County
S-57 (N Old River) over Willow Creek
S-29 (S Cashua Dr) over Jefferies Creek
S-356 (W McIver Rd) over High Hill Creek
Estimated Schedule
-
Timeline item 1 - incomplete
Public Information Meetings
Thursday, November 06, 2025
- S-57 (N Old River) over Willow Creek
- S-29 (S Cashua Dr) over Jefferies Creek
- S-356 (W McIver Rd) over High Hill Creek
-
Timeline item 2 - incomplete
Construction
Construction Start - TBD
Detour Routes
Georgetown County
S-31 (Mount Zion Ave) over Lane Creek
S-24 (Powell Rd) over Pole Swamp
Estimated Schedule
-
Timeline item 1 - incomplete
Construction
Construction Start - TBD
Detour Routes
Horry County
S-65 (HWY 65) over Grier Swamp
S-134 (HWY 1340) over Jenkins Swamp
S-65 (HWY 65) over Maple Swamp
S-105 (Old Reaves Ferry Rd) over Stanley Creek
S-569 (Good Luck Rd) over Lousing Swamp
Estimated Schedule
-
Timeline item 1 - incomplete
Public Information Meetings
Thursday, October 16, 2025
- S-134 (Hwy 134) over Jenkins Swamp
- S-105 (Old Reaves Ferry Rd) over Stanley Creek
- S-65 (Hwy 65) over Grier Swamp
- S-65 (Hwy 65) over Maple Swamp
-
Timeline item 2 - incomplete
Construction
Construction Start - TBD
Detour Routes
Marion County
S-32 (Grady Road) over Reedy Creek
Estimated Schedule
-
Timeline item 1 - incomplete
Construction
Construction Start - TBD
Detour Route
Williamsburg County
- S-30 (Sims Reach Rd) over Black River
Estimated Schedule
-
Timeline item 1 - incomplete
Construction
Construction Start - TBD
While engineering will take time, we will continue to provide updates on the progress of the project via this project page. Be sure to hit the "follow" button at the top of this page to receive direct notifications sent to your inbox. Opportunity for public comment will occur during the engineering design phase.
Comments and feedback about this project can be submitted below!