Project Information

Project Description:

The South Carolina Department of Transportation (SCDOT) is proposing to replace 18 bridges in Berkeley, Colleton, Darlington, Dorchester, Florence, Georgetown, Horry, Marion, and Williamsburg counties. These bridges make up Package 22 and are part of the SCDOT’s Closed and Load Restricted Bridge (CLRB) Program.

Proposed Improvements:

Bridges will either be replaced on existing alignment with a signed detour that would reroute traffic during construction; or bridges will be replaced adjacent to the existing alignment allowing through-traffic during construction.

The package is being delivered through a design-build contract, allowing for innovation through design and schedule acceleration.

Purpose and Need:

The purpose of the project is to restore all components to good condition. The eighteen existing bridges have one or more components in poor condition.

Bridges within Package 22:

Click below to view bridges by County

Below you will find information about each bridge within Package 22 organized by County. Information will include location, estimated schedule and detour route, if needed.

Berkeley County

S-791 (Old Hwy 52) over Molly Branch

S-791 (Old Hwy 52) over Canterhill Swamp

S-791 (Old Hwy 52) over Wapoola Creek

Estimated Schedule

  • Timeline item 1 - incomplete

    Construction


    Construction Start - TBD

Colleton County

S-41 (Ritter Rd) over Ashepoo River


Estimated Schedule

  • Timeline item 1 - incomplete

    Construction


    Construction Start - TBD

Darlington County

S-495 (Georgetown Rd) over Back Swamp

Estimated Schedule

  • Timeline item 1 - incomplete

    Construction


    Construction Start - TBD

Detour Route

Dorchester County

S-19 (Wire Rd) over Indian Fields Swamp



Estimated Schedule

  • Timeline item 1 - incomplete

    Construction


    Construction Start - TBD

Florence County

S-57 (N Old River) over Willow Creek
S-29 (S Cashua Dr) over Jefferies Creek
S-356 (W McIver Rd) over High Hill Creek

Estimated Schedule

  • Timeline item 1 - incomplete

    Public Information Meetings

    Thursday, November 06, 2025

    • S-57 (N Old River) over Willow Creek
    • S-29 (S Cashua Dr) over Jefferies Creek
    • S-356 (W McIver Rd) over High Hill Creek
  • Timeline item 2 - incomplete

    Construction


    Construction Start - TBD

Detour Routes

Georgetown County

S-31 (Mount Zion Ave) over Lane Creek
S-24 (Powell Rd) over Pole Swamp

Estimated Schedule

  • Timeline item 1 - incomplete

    Construction


    Construction Start - TBD

Detour Routes

Horry County

S-65 (HWY 65) over Grier Swamp
S-134 (HWY 1340) over Jenkins Swamp
S-65 (HWY 65) over Maple Swamp
S-105 (Old Reaves Ferry Rd) over Stanley Creek
S-569 (Good Luck Rd) over Lousing Swamp

Estimated Schedule

  • Timeline item 1 - incomplete

    Public Information Meetings

    Thursday, October 16, 2025

    • S-134 (Hwy 134) over Jenkins Swamp
    • S-105 (Old Reaves Ferry Rd) over Stanley Creek
    • S-65 (Hwy 65) over Grier Swamp
    • S-65 (Hwy 65) over Maple Swamp
  • Timeline item 2 - incomplete

    Construction


    Construction Start - TBD

Detour Routes

Marion County

S-32 (Grady Road) over Reedy Creek

Estimated Schedule

  • Timeline item 1 - incomplete

    Construction


    Construction Start - TBD

Detour Route

Williamsburg County

  1. S-30 (Sims Reach Rd) over Black River

Estimated Schedule

  • Timeline item 1 - incomplete

    Construction


    Construction Start - TBD

While engineering will take time, we will continue to provide updates on the progress of the project via this project page. Be sure to hit the "follow" button at the top of this page to receive direct notifications sent to your inbox. Opportunity for public comment will occur during the engineering design phase.