Project Information
Project Description:
Proposed Improvements:
- Installation of landscape / raised concrete medians which will require right turns from the below intersections along with numerous business driveways.
- S-302 (Litchfield Drive)
- S-535 (Country Club Drive)
- S-1015 (Crooked Oak Drive)
- S-757 (Channel Bluff Avenue)
- Installation of traffic signal at the Crooked Oak Drive
- Installation of sidewalk
Purpose and Need:
Feedback:
While engineering will take time, we will continue to provide updates on the progress of the project via this project page. Be sure to hit the "follow" button at the top of this page to receive direct notifications sent to your inbox. Opportunity for public comment will occur during the engineering design phase.The Comment period starts on 04/28/26 and ends on 05/29/26
Comments and feedback about this project can be submitted below!