  • Purpose and Need

    The purpose of this project is to improve safety at the intersection of US 17 Alt. @ S-13 through engineering solutions identified to reduce the frequency and severity of crashes.

    The need for the project was identified through traffic data collection and historic crash reporting. A recent study of intersections converted to roundabouts from the SCDOT Traffic Safety Office has shown a reduction in injury crashes by 79% and total crashes by 66%.

Estimated Schedule

  • Timeline item 1 - incomplete

    Right of Way Aquisition

    Early 2026

  • Timeline item 2 - incomplete

    Construction

    Mid 2027

    Construction Duration - Approximately 18 Months