Project Information

  • Proposed Improvements

    The project includes replacing the existing bridge structure and constructing the roadway to meet current design and safety standards. The existing S-832 facility is comprised of two, 10-foot travel lanes with approximately 1-foot paved shoulders. The proposed roadway section will provide two, 11-foot travel lanes with 2-foot paved and 2-foot grassed shoulders.

  • Purpose and Need

    The purpose of the project is to correct structural deficiencies of the existing S-832 bridge over Abernathy Creek. The bridge has been determined to be unsafe and is currently closed to traffic.

Estimated Schedule

  • Timeline item 1 - incomplete

    Right of Way Aquisition

    Winter 2025

  • Timeline item 2 - incomplete

    Construction

    Begins -- Summer 2026

    Construction Duration: Approximately 12 months