Project Detour Route
During bridge construction, two lanes of traffic on US 76/378 will flow from both directions onto newly constructed off-ramps. Temporary traffic signals will be added at US 378/76 and US 601 and will remain in place throughout construction, which will last approximately 14 months. Through traffic will continue smoothly from the ramps back onto US 76/378.